Road Improvement Program

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Anticipated Schedule for Road Upgrades

As part of our effort to maintain the streets in the Township, the Engineering Department undertakes projects every year to work on various roads. These improvements generally consist of new handicap ramps at the intersection of the streets and providing a new pavement surface on the road. The work does not include new sidewalks and curbing along the streets, except where necessary for drainage issues.

Below is our anticipated schedule for road improvement. This list is based upon a road improvement program that was done in 2007, which ranked the streets in the Township based upon the conditions at the time, and modified to anticipate future budgets. This list is also based upon field inspections where the condition of the pavement and traffic volume are evaluated. We review and modify this list yearly based upon the condition of the streets, so the below is subject to change.

2023

    • Richmond Avenue (Parker Ave to Municipal Border with South Orange)
    • Girard Place (Valley Street to Osborne Terrace)
    • Brown Street (Boyden Ave to Jacoby Street)
    • Henry Place (Brown Street to End)
    • Hudson Avenue (Parker Avenue to Irvington Ave)
    • Dunnell Road (Oakview to Fire HQ)
    • Hilton Ave (Vermont St to Tuscan St)
    • Rutgers St (Burnett Ave to Springfield Ave)
    • Highland Place (Maplewood Ave to Everitt Pl)
    • Tuscan Road (Valley St to Bowdoin St)
    • Clinton Ave (Wyoming Ave to Ridgewood Rd)
    • Roosevelt Road (Wyoming Ave to Ridgewood Rd)
    • Durand Road (Wyoming Ave to Ridgewood Rd)